Services

Rappic Service

Integrated Services that Titan offers for Idle wells, plug and abandon wells (P&A), production wells, gas storage and for (UIC) MIT I and II.

RAPPIC SERVICE: RA Tracer-Noise-Pressure Tests- Pressure Pumps-Injection Test-Plugs/ Packers setting/test-COMBO:

  • Fluid level test (fluid level shots) mainly for idle wells.
  • Pressure tests for: the casing, tubing, with a liquid
  • Injection tests.
  • All in one combo: BPV – Two-way check valves – Testing – Slick line services – Plug setting -Wellhead Valve Change Outs – Hydraulic wrenches nipple up / nipple down – Tubing / CIT testing -Pressure testing – Pumping services.
  • Real time surface and downhole pressure recording.
  • Bottom hole pressure recording.
  • Step rate test. Lap test.
  • Clean out tag with gauge ring.
  • Spectral noise-temperature.
  • Electromagnetic thickness tool (casing wall thickness) internal/external corrosion (up to three interphases).
  • Ultrasonic imaging (cement map), cement evaluation and radial cement bond.
  • Ultrasonic leak detection.
  • Ultrasonic acoustic leak detection.
  • Ultrasonic magnetic thickness.
  • X-YCaliper, Multi-finger caliper survey (MFC) 24, 40, 60, and 80 arms. HT MFC 430 deg. F.
  • Pressure-Temperature survey, PTS-GR-CCL, PT-GRCCL, or GR-CCL, Temp survey.
  • Radioactive Tracer, Noise tool.
  • Plugs/Packers.
  • Pulsed Neutron logs.
  • Down-hole Video